Resources & Installation Guides

Magwall NZ Panel test results

 

MGO SIP vs Traditional Construction


Click the video link to see the results.


SIP Panel Installation

Step 1: Bottom Plate Set-out.

Step 2: Air Sealing Bottom Plate.

Step 3: Bracing - First Panel.

Step 4: Fitting First Panel.

Step 5: Preparing Wall Plate & Installing Second Plate.

Step 6: Making Structural Panel Connector

Step 7: Air Sealing Next Panel.

Step 8: Fitting Next Panel.

Step 9: Installing Top Plate.